+Article 99 2.

Article 99 2.

For the purposes of deciding that a group resolution scheme is not needed, as referred to in Article 92(2) of Directive 2014/59/EU, the group-level resolution authority shall prepare its draft decision after assessing that the Union parent undertaking meets the conditions referred to in Articles 32 and 33 of that Directive and that none of the conditions referred to in points (a) to (d) of Article 92(1) of Directive 2014/59/EU applies.

1. Yleiskatsaus

,
Otsikko Sääntely

1.1 Viittaukset

1.2 Tunnistetut vaatimukset

1.3 Liittyvät standardit

2. Tunnistetut vaatimukset

Vaatimukset
Lähde Vaatimus

3. Liittyvät standardit

Standardit
Lähde Vaatimus