|
+Article 15 2. |
Article 15 2.Inspections should include activities such as visits of the surface installations, including the injection facilities, assessing the injection and monitoring operations carried out by the operator, and checking all relevant records kept by the operator.
1. Yleiskatsaus
1.1 Viittaukset1.2 Tunnistetut vaatimukset1.3 Liittyvät standardit2. Tunnistetut vaatimukset
3. Liittyvät standardit
|