+Article 8 3

Article 8 3

3.   Before submitting the proposed methodology, the ENTSO for Electricity shall conduct a consultation involving at least the regional coordination centres, industry and consumer organisations, producers or their trade bodies, transmission system operators, relevant distribution system operators, competent authorities, regulatory authorities and other relevant national authorities. The ENTSO for Electricity shall duly take into account the results of the consultation and present them, together with the proposed methodology, at a meeting of the ECG.

1. Yleiskatsaus

,
Otsikko Sääntely

1.1 Viittaukset

1.2 Tunnistetut vaatimukset

1.3 Liittyvät standardit

2. Tunnistetut vaatimukset

Vaatimukset
Lähde Vaatimus

3. Liittyvät standardit

Standardit
Lähde Vaatimus