+Article 73 4.

Article 73 4.

The Commission is empowered to adopt an implementing act establishing detailed technical and verification requirements that waste LMT batteries, waste industrial batteries or waste electric vehicle batteries are to fulfil to cease being waste. That implementing act shall be adopted in accordance with the examination procedure referred to in Article 90(3).

1. Yleiskatsaus

,
Otsikko Sääntely

1.1 Viittaukset

1.2 Tunnistetut vaatimukset

1.3 Liittyvät standardit

2. Tunnistetut vaatimukset

Vaatimukset
Lähde Vaatimus

3. Liittyvät standardit

Standardit
Lähde Vaatimus