+Article 8 3.

Article 8 3.

The project promoter shall notify the Commission of:

(a) 

changes to the Strategic Project affecting its fulfilment of the criteria laid down in Article 6(1);

(b) 

changes in control of the undertakings involved in the Strategic Project on a lasting basis, compared to the information referred to in Article 7(1), point (e).

1. Yleiskatsaus

,
Otsikko Sääntely

1.1 Viittaukset

1.2 Tunnistetut vaatimukset

1.3 Liittyvät standardit

2. Tunnistetut vaatimukset

Vaatimukset
Lähde Vaatimus

3. Liittyvät standardit

Standardit
Lähde Vaatimus