+Article 5 3.
|
Article 5 3.
Discharges from urban waste water treatment plants described in paragraph 2 shall satisfy the relevant requirements of section B of Annex I. The Commission may amend those requirements. Those measures, designed to amend non-essential elements of this Directive, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 18(3).
1. Vue d’ensemble
| Intitulé |
Réglementation |
,
1.1 Références
1.2 Exigences identifiées
1.3 Normes associées
2. Exigences identifiées
Exigences
| Source |
Exigence |
3. Normes associées
|