+Article 33 1.

Article 33 1.

Member States shall ensure that operators of all combustion plants with a rated electrical output of 300 megawatts or more for which the original construction licence or, in the absence of such a procedure, the original operating licence is granted after the entry into force of Directive 2009/31/EC of the European Parliament and of the Council of 23 April 2009 on the geological storage of carbon dioxide () , have assessed whether the following conditions are met:

— 
suitable storage sites are available,
— 
transport facilities are technically and economically feasible,
— 
it is technically and economically feasible to retrofit for CO2 capture.

1. Vue d’ensemble

,
Intitulé Réglementation

1.1 Références

1.2 Exigences identifiées

1.3 Normes associées

2. Exigences identifiées

Exigences
Source Exigence

3. Normes associées

Normes
Source Exigence