|
+Article 11 6. |
Article 11 6.Where there is a material change affecting the design notification or the relocation notification prior to the submission of the report on major hazards, the competent authority shall be notified of that change as soon as possible.
1. Vue d’ensemble
1.1 Références1.2 Exigences identifiées1.3 Normes associées2. Exigences identifiées
3. Normes associées
|