+Article 4 5. |
Article 4 5.Member States may limit tendering procedures to specific technologies where opening support schemes to all producers of electricity from renewable sources would lead to a suboptimal result, in view of:
(a)
the long-term potential of a particular technology;
(b)
the need to achieve diversification;
(c)
grid integration costs;
(d)
network constraints and grid stability;
(e)
for biomass, the need to avoid distortions of raw materials markets. 1. Vue d’ensemble
1.1 Références1.2 Exigences identifiées1.3 Normes associées2. Exigences identifiées