+Article 16c 1.

Article 16c 1.

Where repowering of a renewable energy power plant does not result in an increase of the capacity of a renewable energy power plant beyond 15 %, and without prejudice to any assessment of potential environmental impact required pursuant to paragraph 2, Member States shall ensure that permit granting procedures for connections to the transmission or distribution grid shall not exceed three months following application to the relevant entity unless there are justified safety concerns or there is technical incompatibility of the system components.

1. Vue d’ensemble

,
Intitulé Réglementation

1.1 Références

1.2 Exigences identifiées

1.3 Normes associées

2. Exigences identifiées

Exigences
Source Exigence

3. Normes associées

Normes
Source Exigence