+Article 17 2.

Article 17 2.

Member States may allow a simple-notification procedure for installations or aggregated production units with an electrical capacity of above 10,8 kW and up to 50 kW, provided that grid stability, grid reliability and grid safety are maintained.

1. Vue d’ensemble

,
Intitulé Réglementation

1.1 Références

1.2 Exigences identifiées

1.3 Normes associées

2. Exigences identifiées

Exigences
Source Exigence

3. Normes associées

Normes
Source Exigence