+Article 6 10.

Article 6 10.

At the request of the transmission system operator, the regulatory authority may decide to extend the contractual period of the remaining part of balancing capacity referred to in paragraph 9 to a maximum period of twelve months provided that such a decision is limited in time, and the positive effects in terms of lowering of costs for final customers exceed the negative impacts on the market. The request shall include:

(a) 

the specific period during which the exemption would apply;

(b) 

the specific volume of balancing capacity to which the exemption would apply;

(c) 

an analysis of the impact of the exemption on the participation of balancing resources; and

(d) 

a justification for the exemption demonstrating that such an exemption would lead to lower costs to final customers.

1. Vue d’ensemble

,
Intitulé Réglementation

1.1 Références

1.2 Exigences identifiées

1.3 Normes associées

2. Exigences identifiées

Exigences
Source Exigence

3. Normes associées

Normes
Source Exigence