|
+Article 59 14. |
Article 59 14.Where the Commission proposes to adopt a network code on its own initiative, the Commission shall consult ACER, the ENTSO for Electricity and all relevant stakeholders in regard to the draft network code during a period of no less than two months.
1. Vue d’ensemble
1.1 Références1.2 Exigences identifiées1.3 Normes associées2. Exigences identifiées
3. Normes associées
|