+Article 17 3.
|
Article 17 3.
An additional conformity assessment of batteries that have been subject to preparation for re-use, preparation for repurposing, repurposing or remanufacturing, shall be carried out in accordance with the procedure ‘Module A – Internal production control’, set out in Part A of Annex VIII, taking into account the requirements laid down in Articles 6, 9, 10, 12, 13 and 14.
1. Vue d’ensemble
| Intitulé |
Réglementation |
,
1.1 Références
1.2 Exigences identifiées
1.3 Normes associées
2. Exigences identifiées
Exigences
| Source |
Exigence |
3. Normes associées
|