+Article 7 8.

Article 7 8.

By way of derogation from paragraphs 3 and 5, Member States may decide that an individual urban wastewater treatment plant situated in an area included in the list referred to in paragraph 2 is not to be subject to the requirements set out in paragraphs 3 and 5 where it can be shown that the minimum percentage of reduction of the overall load entering all urban wastewater treatment plants in that area is:

(a) 

at least 75 % for total phosphorus and at least 75 % for total nitrogen from 1 January 2025;

(b) 

82,5  % for total phosphorus and 80 % for total nitrogen by 31 December 2039;

(c) 

87,5  % for total phosphorus and 82,5  % for total nitrogen by 31 December 2045.

1. Vue d’ensemble

,
Intitulé Réglementation

1.1 Références

1.2 Exigences identifiées

1.3 Normes associées

2. Exigences identifiées

Exigences
Source Exigence

3. Normes associées

Normes
Source Exigence