|
+Article 12 8 |
Article 12 88. The competent authorities shall make the reports referred to in this Article available to the public and the Commission in accordance with Article 5(4), within 3 months from their submission by the relevant operators or undertakings. 1. Vue d’ensemble
1.1 Références1.2 Exigences identifiées1.3 Normes associées2. Exigences identifiées
3. Normes associées
|