+ANNEX
---+1. SUMMARY OF THE ELECTRICITY CRISIS SCENARIOS
---+2. ROLES AND RESPONSIBILITIES OF THE COMPETENT AUTHORITY
---+3. PROCEDURES AND MEASURES IN THE ELECTRICITY CRISIS
------+3.1. National procedures and measures
------+3.2. Regional and bilateral procedures and measures
---+4. CRISIS COORDINATOR
---+5. STAKEHOLDER CONSULTATIONS
---+6. EMERGENCY TESTS
|
ANNEX
ANNEX
1. Vue d’ensemble
| Intitulé |
Réglementation |
|
1. SUMMARY OF THE ELECTRICITY CRISIS SCENARIOS
|
1. SUMMARY OF THE ELECTRICITY CRISIS SCENARIOS Describe briefly the electricity crisis scenarios identified at regional and national level in accordance with the procedure laid down in Articles 6 and 7, including the description of the assumptions applied.
|
|
2. ROLES AND RESPONSIBILITIES OF THE COMPETENT AUTHORITY
|
2. ROLES AND RESPONSIBILITIES OF THE COMPETENT AUTHORITY Define the role and responsibilities of the competent authority and the bodies to which tasks have been delegated. Describe which tasks, if any, have been delegated to other bodies.
|
|
3. PROCEDURES AND MEASURES IN THE ELECTRICITY CRISIS
|
3. PROCEDURES AND MEASURES IN THE ELECTRICITY CRISIS
|
|
4. CRISIS COORDINATOR
|
4. CRISIS COORDINATOR Indicate and define the role of the crisis coordinator. Specify the contact details.
|
|
5. STAKEHOLDER CONSULTATIONS
|
5. STAKEHOLDER CONSULTATIONS In accordance with Article 10(1), describe the mechanism used for and the results of the consultations carried out, for the development of this plan, with:
|
(a)
|
relevant electricity and natural gas undertakings, including relevant producers or their trade bodies;
|
|
(b)
|
relevant organisations representing the interests of non-industrial electricity customers;
|
|
(c)
|
relevant organisations representing the interests of industrial electricity customers;
|
|
(d)
|
regulatory authorities;
|
|
(e)
|
the transmission system operators;
|
|
(f)
|
relevant distribution system operators.
|
|
|
6. EMERGENCY TESTS
|
6. EMERGENCY TESTS
|
(a)
|
Indicate the calendar for the biennial regional (and, if applicable also national) real time response simulations of electricity crises;
|
|
(b)
|
In accordance with point (d) of Article 12(1), indicate procedures agreed and the actors involved.
|
For the updates of the plan: briefly describe the tests carried out since the last plan was adopted and the main results. Indicate which measures have been adopted as a result of those tests.
|
,