+2. If, on the basis of the yearly monitoring report of ACER referred to in point 2.2.1(2), it is …
|
2. If, on the basis of the yearly monitoring report of ACER referred to in point 2.2.1(2), it is …
|
2.
|
If, on the basis of the yearly monitoring report of ACER referred to in point 2.2.1(2), it is shown that a situation as described in point 1 is unlikely to reoccur in the following three years, for example as a result of capacity becoming available from physical expansion of the network or termination of long-term contracts, the relevant regulatory authorities may decide to terminate the firm day-ahead use-it-or-lose-it mechanism.
|
1. Vue d’ensemble
| Intitulé |
Réglementation |
,
1.1 Références
1.2 Exigences identifiées
1.3 Normes associées
2. Exigences identifiées
Exigences
| Source |
Exigence |
3. Normes associées
|