+DER.3.2.A12 Creation of a Gap Analysis Plan [IS Audit Team] (S)

DER.3.2.A12 Creation of a Gap Analysis Plan [IS Audit Team] (S)

Prior to an IS audit, the IS Audit Team SHOULD create a Gap Analysis Plan. If it is necessary to extend or otherwise adapt the planned procedures during the audit, the Gap Analysis Plan SHOULD be adapted accordingly. The Gap Analysis Plan SHOULD also be included in the final IS audit report.

During an IS partial audit, the binding audit subject list from BSI SHOULD be used as the Gap Analysis Plan.

1. Forbhreathnú

Teideal Caighdeán

1.1 Tagairtí

1.2 Ceanglais aitheanta

1.3 Rialacháin ghaolmhara

2. Ceanglais aitheanta

Ceanglais
Foinse Ceanglas

3. Rialacháin ghaolmhara

Rialacháin
Foinse Rialáil

Saincheisteanna nasctha

Naisc
Cineál naisc Saincheist
blocks G 0.18 Poor Planning or Lack of Adaptation