+SYS.1.7.A26 Workload Management for z/OS Systems (S)

SYS.1.7.A26 Workload Management for z/OS Systems (S)

The programs, files, and commands of the Workload Manager (WLM), as well as the necessary couple data sets, SHOULD be protected by RACF. It SHOULD be ensured that the authorisations required to change the WLM via z/OS commands and via the SDSF interface are the same.

1. Forbhreathnú

Teideal Caighdeán

1.1 Tagairtí

1.2 Ceanglais aitheanta

1.3 Rialacháin ghaolmhara

2. Ceanglais aitheanta

Ceanglais
Foinse Ceanglas

3. Rialacháin ghaolmhara

Rialacháin
Foinse Rialáil

Saincheisteanna nasctha