+NET.1.1.A26 Specification of Operating Processes for the Network (S)

NET.1.1.A26 Specification of Operating Processes for the Network (S)

Operating processes SHOULD be created, adapted as required, and documented. In particular, the impact of zoning and segmentation concepts on IT operations SHOULD be considered.

1. Forbhreathnú

Teideal Caighdeán

1.1 Tagairtí

1.2 Ceanglais aitheanta

1.3 Rialacháin ghaolmhara

2. Ceanglais aitheanta

Ceanglais
Foinse Ceanglas

3. Rialacháin ghaolmhara

Rialacháin
Foinse Rialáil

Saincheisteanna nasctha