+INF.2.A26 Redundant Design of Emergency Power Systems [Planner] (H)
|
INF.2.A26 Redundant Design of Emergency Power Systems [Planner] (H)
Emergency power systems SHOULD be redundant. With regard to maintenance, a redundant EPS MUST also be treated according to INF.2.A14 Use of an Emergency Power System.
1. Forbhreathnú
1.1 Tagairtí
1.2 Ceanglais aitheanta
1.3 Rialacháin ghaolmhara
2. Ceanglais aitheanta
Ceanglais
| Foinse |
Ceanglas |
3. Rialacháin ghaolmhara
Rialacháin
| Foinse |
Rialáil |
Saincheisteanna nasctha
|