+178. Institutions should ensure that the calculation of costs associated with the development …

178. Institutions should ensure that the calculation of costs associated with the development …

Institutions should ensure that the calculation of costs associated with the development include contingencies for cost overruns. Planned contingencies should be included in the credit limit or equity. Institutions should assess the level of cash reserves and liquidity profile of the borrower to ensure that the borrower has the capacity to fund unplanned contingencies for cost overruns and delays, if any, above the contingency sum.

1. Forbhreathnú

,
Teideal Rialáil

1.1 Tagairtí

1.2 Ceanglais aitheanta

1.3 Caighdeáin ghaolmhara

2. Ceanglais aitheanta

Ceanglais
Foinse Ceanglas

3. Caighdeáin ghaolmhara

Caighdeáin
Foinse Ceanglas
  • EBA - Published by the European Banking Authority at https://www.eba.europa.eu/