+Article 5 5.

Article 5 5.

The existence of force majeure or bona fide inability to settle provisions shall not prevent a contract from being considered as ‘physically settled’ for the purposes of Section C(6) of Annex I to Directive 2014/65/EU.

1. Forbhreathnú

,
Teideal Rialáil

1.1 Tagairtí

1.2 Ceanglais aitheanta

1.3 Caighdeáin ghaolmhara

2. Ceanglais aitheanta

Ceanglais
Foinse Ceanglas

3. Caighdeáin ghaolmhara

Caighdeáin
Foinse Ceanglas