+Article 8 1

Article 8 1

1.   Before introducing an operating restriction, the competent authorities shall give to the Member States, the Commission and the relevant interested parties six months’ notice, ending at least two months prior to the determination of the slot coordination parameters as defined in point (m) of Article 2 of Council Regulation (EEC) No 95/93 (10) for the airport concerned for the relevant scheduling period.

1. Forbhreathnú

,
Teideal Rialáil

1.1 Tagairtí

1.2 Ceanglais aitheanta

1.3 Caighdeáin ghaolmhara

2. Ceanglais aitheanta

Ceanglais
Foinse Ceanglas

3. Caighdeáin ghaolmhara

Caighdeáin
Foinse Ceanglas