+Article 6 12.

Article 6 12.

By 1 January 2028, regulatory authorities shall report to the Commission and ACER on the share of the total capacity covered by contracts with a duration or a procurement period of longer than one day.

1. Forbhreathnú

,
Teideal Rialáil

1.1 Tagairtí

1.2 Ceanglais aitheanta

1.3 Caighdeáin ghaolmhara

2. Ceanglais aitheanta

Ceanglais
Foinse Ceanglas

3. Caighdeáin ghaolmhara

Caighdeáin
Foinse Ceanglas