+Article 24 3.

Article 24 3.

Evaluations of the Joint Undertakings’ operations shall be carried out in a timely manner to feed into the interim evaluation and final evaluation of Horizon Europe and the related decision-making process as specified in Article 52 of Regulation (EU) 2021/695.

1. Forbhreathnú

,
Teideal Rialáil

1.1 Tagairtí

1.2 Ceanglais aitheanta

1.3 Caighdeáin ghaolmhara

2. Ceanglais aitheanta

Ceanglais
Foinse Ceanglas

3. Caighdeáin ghaolmhara

Caighdeáin
Foinse Ceanglas