|
+Article 5 10. |
Article 5 10.By 14 April 2025, the operators of publicly accessible recharging points shall ensure that all direct current (DC) publicly accessible recharging points operated by them have a fixed recharging cable installed.
1. Forbhreathnú
1.1 Tagairtí1.2 Ceanglais aitheanta1.3 Caighdeáin ghaolmhara2. Ceanglais aitheanta
3. Caighdeáin ghaolmhara
|