|
+Article 6 3. |
Article 6 3.Operators of stationary equipment listed in Article 5(2), points (a) to (e), that is subject to paragraphs 1 or 2 of this Article shall ensure that leakage detection systems are checked at least once every 12 months to ensure their proper functioning.
1. Forbhreathnú
1.1 Tagairtí1.2 Ceanglais aitheanta1.3 Caighdeáin ghaolmhara2. Ceanglais aitheanta
3. Caighdeáin ghaolmhara
|