+Article 10 1.

Article 10 1.

All newly constructed buildings and buildings undergoing major renovation works, including elements under joint ownership, for which applications for building permits have been submitted after 12 February 2026, shall be equipped with a fibre-ready in-building physical infrastructure and in-building fibre wiring, including connections up to the physical point where the end user connects to the public network.

1. Forbhreathnú

,
Teideal Rialáil

1.1 Tagairtí

1.2 Ceanglais aitheanta

1.3 Caighdeáin ghaolmhara

2. Ceanglais aitheanta

Ceanglais
Foinse Ceanglas

3. Caighdeáin ghaolmhara

Caighdeáin
Foinse Ceanglas