Članak 11. Gradnja i upravljanje postrojenjima za gospodarenje otpadom

Članak 11.

Gradnja i upravljanje postrojenjima za gospodarenje otpadom

1.  Države članice poduzimaju odgovarajuće mjere kako bi osigurale da se upravljanje postrojenjem za gospodarenje otpadom povjeri osobi koja je za to nadležna te da se omogući tehnički razvoj i obuka osoblja.

2.  Nadležno tijelo utvrđuje da operater prilikom gradnje novog postrojenja za gospodarenje otpadom ili izmjene postojeće, osigura:

(a) da je postrojenje za gospodarenje otpadom odgovarajuće smješteno, uzimajući u obzir posebne obveze Zajednice ili nacionalne obveze u vezi sa zaštićenim područjima te geološkim, hidrološkim, hidrogeološkim, seizmičkim i geotehničkim čimbenicima, te projektirana tako da zadovoljava potrebne uvjete za kratkoročno i dugoročno sprečavanje onečišćenje tla, zraka, podzemnih ili površinskih voda, posebno uzimajući u obzir direktive 76/464/EEZ ( 21 ), 80/68/EEZ ( 22 ) i 2000/60/EZ, te da je osigurano djelotvorno sakupljanje onečišćenih i procjednih voda kako i kada to zahtijeva dozvola, i da se smanjuje erozija uzrokovana vodom ili vjetrom, u onoj mjeri u kojoj je to tehnički moguće i ekonomski izvedivo;

(b) da je postrojenje za gospodarenje otpadom izgrađeno, i da se održava na način koji osigurava fizikalnu stabilnost, i sprečava kratkoročno i dugoročno onečišćenje tla, zraka, površinskih ili podzemnih voda, i da se moguća šteta krajobraza smanji na najmanju moguću mjeru;

(c) da se izrade odgovarajući planovi i rješenja za redovito praćenje i inspekciju postrojenja za gospodarenje otpadom koje obavljaju nadležne osobe, te za poduzimanje mjera u slučaju da postoje dokazi koji ukazuju na nestabilnost ili na onečišćenje voda i tla;

(d) da se izrade odgovarajući planovi i rješenja za sanaciju zemljišta i zatvaranje postrojenja za gospodarenje otpadom;

(e) da se izrade odgovarajući planovi i rješenja za upravljanje postrojenjem za gospodarenje otpadom u fazi nakon zatvaranja.

Kako bi se osigurao odgovarajući prijenos podataka, posebno u slučaju zamjene operatera, vodi se evidencija o praćenju i inspekcijama iz točke (c), zajedno s dokumentacijom dozvole.

3.  Operater, bez nepotrebne odgode i u svakom slučaju najkasnije u roku od 48 sati, uredno obavješćuje nadležno tijelo o svakom slučaju koji bi mogao ugroziti stabilnost postrojenja za gospodarenje otpadom te o bilo kojim štetnim utjecajima na okoliš otkrivenim tijekom postupaka kontrole i praćenja postrojenja za gospodarenje otpadom. Prema potrebi, operater provodi unutarnji plan za hitne slučajeve te se pridržava svih drugih uputa nadležnog tijela u vezi s potrebnim mjerama za normalizaciju stanja.

Operater snosi troškove potrebnih mjera.

Operater u rokovima koje odredi nadležno tijelo, a u svakom slučaju jednom godišnje, nadležnom tijelu dostavlja, na temelju ukupnih podataka, sve rezultate praćenja kako bi dokazalo da su ispunjeni uvjeti dozvole i da su se stekla veća saznanja o ponašanju otpada i postrojenja za gospodarenje otpadom. Na temelju ovog izvješća, nadležno tijelo može odlučiti da je potrebna potvrda neovisnog stručnjaka.

1. Pregled

,
Naslov Regulativa
Article 11 1.
Member States shall take appropriate measures to ensure that the management of a waste facility is in the hands of a competent person and that technical development and training of staff are provided.
Article 11 2.

The competent authority shall satisfy itself that, in constructing a new waste facility or modifying an existing waste facility, the operator ensures that:

(a) 

the waste facility is suitably located, taking into account in particular Community or national obligations relating to protected areas, and geological, hydrological, hydrogeological, seismic and geotechnical factors, and is designed so as to meet the necessary conditions for, in the short and long‐term perspectives, preventing pollution of the soil, air, groundwater or surface water, taking into account especially Directives 76/464/EEC ( 21 ), 80/68/EEC ( 22 ) and 2000/60/EC, and ensuring efficient collection of contaminated water and leachate as and when required under the permit, and reducing erosion caused by water or wind as far as it is technically possible and economically viable;

(b) 

the waste facility is suitably constructed, managed and maintained to ensure its physical stability and to prevent pollution or contamination of soil, air, surface water or groundwater in the short and long-term perspectives as well as to minimise as far as possible damage to landscape;

(c) 

there are suitable plans and arrangements for regular monitoring and inspection of the waste facility by competent persons and for taking action in the event of results indicating instability or water or soil contamination;

(d) 

suitable arrangements are made for the rehabilitation of the land and the closure of the waste facility;

(e) 

suitable arrangements are made for the after-closure phase of the waste facility.

Records of the monitoring and inspections referred to in point (c) shall be kept, together with permit documentation, in order to ensure the appropriate hand-over of information, particularly in the event of a change of operator.

Article 11 3.

The operator shall, without undue delay and in any event not later than 48 hours thereafter, notify the competent authority of any events likely to affect the stability of the waste facility and any significant adverse environmental effects revealed by the control and monitoring procedures of the waste facility. The operator shall implement the internal emergency plan, where applicable, and follow any other instruction from the competent authority as to the corrective measures to be taken.

The operator shall bear the costs of the measures to be undertaken.

At a frequency to be determined by the competent authority, and in any event at least once a year, the operator shall report, on the basis of aggregated data, all monitoring results to the competent authorities for the purposes of demonstrating compliance with permit conditions and increasing knowledge of waste and waste facility behaviour. On the basis of this report the competent authority may decide that validation by an independent expert is necessary.

1.1 Reference

1.2 Utvrđeni zahtjevi

1.3 Povezani standardi

2. Utvrđeni zahtjevi

Zahtjevi
Izvor Zahtjev

3. Povezani standardi

Standardi
Izvor Zahtjev
  • Builddate: 07.08.2009 00:00:00 -Doknr: CELEX:32006L0021
  • EULAW -

    EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.

    DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.