+INF.14.A1 Planning BACS (B) [Planner]

INF.14.A1 Planning BACS (B) [Planner]

For the trades controlled by BACS, a plan for designing the BACS in a secure manner MUST be established.

BACS MUST be taken into account when planning the new construction, conversion, extension, or refurbishment of a building. BACS MUST therefore be considered in planning and construction processes for all BACS-relevant components and building services systems, including in connection with building information modelling (BIM).

Within the scope of BACS planning, the BACS to be set up MUST be specified. The extent to which building services systems are to be controlled automatically via BACS MUST be specified.

BACS SHOULD be planned in a way that minimises the different BACS, communication protocols, and interfaces used for the coupling and integration of building services systems. Secure and standardised protocols and interfaces SHOULD be used. When taking decisions regarding the necessary systems, protocols, and interfaces, the expected functionality SHOULD be weighed against a potential increase in effort to ensure operational and information security.

The planning SHOULD be documented, reviewed both regularly and whenever required, and adjusted to the state of the art if necessary.

Furthermore, the planning SHOULD be compared against the current configuration both on a regular basis and as required (gap analysis).

1. Pregled

Naslov Standard

1.1 Reference

1.2 Utvrđeni zahtjevi

1.3 Povezani propisi

2. Utvrđeni zahtjevi

Zahtjevi
Izvor Zahtjev

3. Povezani propisi

Propisi
Izvor Regulativa

Povezani zadaci

Poveznice
Vrsta poveznice Zadatak
blocks G 0.18 Poor Planning or Lack of Adaptation