+Article 8 2.

Article 8 2.

Member States shall lay down the criteria for the grant of authorisations for the construction of generating capacity in their territory. In determining appropriate criteria, Member States shall consider:

(a) 

the safety and security of the electricity system, installations and associated equipment;

(b) 

the protection of public health and safety;

(c) 

the protection of the environment;

(d) 

land use and siting;

(e) 

the use of public ground;

(f) 

energy efficiency;

(g) 

the nature of the primary sources;

(h) 

the characteristics particular to the applicant, such as technical, economic and financial capabilities;

(i) 

compliance with measures adopted pursuant to Article 9;

(j) 

the contribution of generating capacity to meeting the overall Union target of at least a 32 % share of energy from renewable sources in the Union's gross final consumption of energy in 2030 referred to in Article 3(1) of Directive (EU) 2018/2001 of the European Parliament and of the Council ( 5 );

(k) 

the contribution of generating capacity to reducing emissions; and

(l) 

the alternatives to the construction of new generating capacity, such as demand response solutions and energy storage.

1. Pregled

,
Naslov Regulativa

1.1 Reference

1.2 Utvrđeni zahtjevi

1.3 Povezani standardi

2. Utvrđeni zahtjevi

Zahtjevi
Izvor Zahtjev

3. Povezani standardi

Standardi
Izvor Zahtjev