+Article 19e 8.

Article 19e 8.

ENTSO for Electricity shall update the Union-wide network development plan to include the results of the national reports of flexibility needs referred to in paragraph 1. Those reports shall be considered by transmission system operators and distribution system operators in their network development plans.

1. Pregled

,
Naslov Regulativa

1.1 Reference

1.2 Utvrđeni zahtjevi

1.3 Povezani standardi

2. Utvrđeni zahtjevi

Zahtjevi
Izvor Zahtjev

3. Povezani standardi

Standardi
Izvor Zahtjev