+Article 14 3.
|
Article 14 3.
In order to ensure an optimal configuration of bidding zones, a bidding zone review shall be carried out. That review shall identify all structural congestions and shall include an analysis of different configurations of bidding zones in a coordinated manner with the involvement of affected stakeholders from all relevant Member States, in accordance with the capacity allocation and congestion management guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009. Current bidding zones shall be assessed on the basis of their ability to create a reliable market environment, including for flexible generation and load capacity, which is crucial to avoiding grid bottlenecks, balancing electricity demand and supply, securing the long-term security of investments in network infrastructure.
1. Áttekintés
1.1 Hivatkozások
1.2 Azonosított követelmények
1.3 Kapcsolódó szabványok
2. Azonosított követelmények
Követelmények
| Forrás |
Követelmény |
3. Kapcsolódó szabványok
Szabványok
| Forrás |
Követelmény |
|