|
+Article 48 2. |
Article 48 2.The notification shall be made without delay following a determination that the conditions referred to in points (a) and (b) of Article 32(1) of Directive 2014/59/EU have been met.
1. Panoramica
1.1 Riferimenti1.2 Requisiti identificati1.3 Standard correlati2. Requisiti identificati
3. Standard correlati
|