+Article 18 3.

Article 18 3.

Within four months of the date of receipt of the report, the Union parent undertaking may submit observations and propose to the group-level resolution authority alternative measures to remedy the impediments identified in the report.

Where the impediments identified in the report are due to a situation of a group entity referred to in the second subparagraph of Article 17(3) of this Directive, the Union parent undertaking shall, within two weeks of the date of receipt of a notification made in accordance with the second subparagraph of paragraph 2 of this Article, propose to the group-level resolution authority possible measures and the timeline for their implementation to ensure that the group entity complies with the requirements referred to in Articles 45e or 45f of this Directive expressed as a percentage of the total risk exposure amount calculated in accordance with Article 92(3) of Regulation (EU) No 575/2013 and, where applicable, with the combined buffer requirement, and with the requirements referred to in Article 45e and 45f of this Directive expressed as a percentage of the total exposure measure referred to in Articles 429 and 429a of Regulation (EU) No 575/2013.

The timeline for the implementation of measures proposed under the second subparagraph shall take into account the reasons for the substantive impediment. The resolution authority, after consulting the competent authority, shall assess whether those measures effectively address or remove the substantive impediment.

1. Panoramica

,
Titolo Regolamentazione

1.1 Riferimenti

1.2 Requisiti identificati

1.3 Standard correlati

2. Requisiti identificati

Requisiti
Fonte Requisito

3. Standard correlati

Standard
Fonte Requisito