|
+Article 3 3. |
Article 3 3.The Member State responsible shall ensure that a thorough capacity analysis is carried out at an airport with no designation status or at a schedules facilitated airport by the managing body of that airport or by any other competent body when that Member State considers it necessary, or within six months:
(i)
following a written request from air carriers representing more than half of the operations at an airport or from the managing body of the airport when either considers that capacity is insufficient for actual or planned operations at certain periods; or
(ii)
upon request from the Commission, in particular where an airport is in reality accessible only for air carriers that have been allocated slots or where air carriers and in particular new entrants encounter serious problems in securing landing and take off possibilities at the airport in question. This analysis, based on commonly recognised methods, shall determine any shortfall in capacity, taking into account environmental constraints at the airport in question. The analysis shall consider the possibilities of overcoming such shortfall through new or modified infrastructure, operational changes, or any other change, and the time frame envisaged to resolve the problems. It shall be updated if paragraph 5 has been invoked, or when there are changes at the airport influencing significantly its capacity and capacity usage. Both the analysis and the method used shall be made available to the parties having requested the analysis and, upon request, to other interested parties. The analysis shall be communicated to the Commission at the same time. 1. Panoramica
1.1 Riferimenti1.2 Requisiti identificati1.3 Standard correlati2. Requisiti identificati
3. Standard correlati
|