+Article 3 5.

Article 3 5.

Where capacity problems occur for at least one scheduling period, the Member State shall ensure that the airport is designated as coordinated for the relevant periods only if:

(a) 

the shortfall is of such a serious nature that significant delays cannot be avoided at the airport, and

(b) 

there are no possibilities of resolving these problems in the short term.

1. Panoramica

,
Titolo Regolamentazione

1.1 Riferimenti

1.2 Requisiti identificati

1.3 Standard correlati

2. Requisiti identificati

Requisiti
Fonte Requisito

3. Standard correlati

Standard
Fonte Requisito