+Article 17 1.

Article 17 1.

Prior to the commencement of deposit operations and at regular intervals thereafter, including the after-closure phase, to be decided by the Member State concerned, the competent authority shall inspect any waste facility covered by Article 7 in order to ensure that it complies with the relevant conditions of the permit. An affirmative finding shall in no way reduce the responsibility of the operator under the conditions of the permit.

1. Panoramica

,
Titolo Regolamentazione

1.1 Riferimenti

1.2 Requisiti identificati

1.3 Standard correlati

2. Requisiti identificati

Requisiti
Fonte Requisito

3. Standard correlati

Standard
Fonte Requisito