+Article 10 5.
|
Article 10 5.
The competent authority of destination may also, within the 30-day time limit referred to in paragraph 1, lay down a condition that the facility which receives the waste shall keep a regular record of inputs, outputs and/or balances for wastes and the related recovery or disposal operations as contained in the notification, and for the period of validity of the notification. Such records shall be signed by a person legally responsible for the facility and be sent to the competent authority of destination within one month of completion of the notified recovery or disposal operation.
1. Panoramica
| Titolo |
Regolamentazione |
,
1.1 Riferimenti
1.2 Requisiti identificati
1.3 Standard correlati
2. Requisiti identificati
Requisiti
| Fonte |
Requisito |
3. Standard correlati
|