Article 1 Subject matter
|
Article 1
This Regulation establishes a financing instrument entitled the European Energy Programme for Recovery (the EEPR) for the development of projects in the field of energy in the Community which, by providing a financial stimulus, contribute to economic recovery, the security of energy supply and the reduction of greenhouse gas emissions.
This Regulation establishes sub-programmes to advance those objectives in the fields of:
(a)
gas and electricity infrastructures;
(b)
offshore wind energy; and
(c)
carbon capture and storage.
This Regulation identifies projects to be financed under each sub-programme and lays down criteria for identifying and implementing actions to realise these projects.
▼M1
This Regulation provides for the creation of a financial facility (the facility) to support energy efficiency and renewable energy initiatives.
▼B
|
|
Article 2 Definitions
|
Article 2
For the purposes of this Regulation, the following definitions shall apply:
(a)
‘carbon capture and storage’ means the capture of carbon dioxide (CO2) from industrial installations, its transport to a storage site and its injection into a suitable underground geological formation for the purposes of permanent storage;
(b)
‘eligible costs’ has the same meaning as in Regulation (EC, Euratom) No 2342/2002;
(c)
‘gas and electricity infrastructures’ means:
(i)
all high-voltage lines, excluding those of distribution networks, and submarine links, provided that this infrastructure is used for interregional or international transmission or connection;
(ii)
high-pressure gas pipelines, excluding those of distribution networks;
(iii)
underground storage facilities connected to the high-pressure gas pipelines referred to in point (ii);
(iv)
reception, storage and regasification facilities for liquefied natural gas (LNG); and
(v)
any equipment or installations essential for the infrastructure referred to in points (i), (ii), (iii) or (iv) to operate properly, including protection, monitoring and control systems;
(d)
‘part of a project’ means any activity that is independent financially, technically or over time and which contributes to the completion of a project;
(e)
‘investment phase’ means the phase of a project during which construction takes place and capital costs are incurred;
(f)
‘offshore wind energy’ means the electric power generated from turbine engines powered by wind and situated in the sea, whether near or far from the shore;
(g)
‘planning phase’ means the phase of a project that precedes the investment phase, during which project implementation is prepared, and includes, where appropriate, feasibility assessment, preparatory and technical studies, obtaining licences and authorisations and incurring capital costs.
|
|
Article 3 Budget
|
|
,