+Article 16 1.
|
Article 16 1.
The permit-granting procedure shall cover all relevant administrative permits to build, repower and operate renewable energy plants, including those combining different renewable energy sources, heat pumps, and co-located energy storage, including power and thermal facilities, as well as assets necessary for the connection of such plants, heat pumps and storage to the grid, and to integrate renewable energy into heating and cooling networks, including grid-connection permits and, where required, environmental assessments. The permit-granting procedure shall comprise all administrative stages from the acknowledgment of the completeness of the permit application in accordance with paragraph 2 to the notification of the final decision on the outcome of the permit-granting procedure by the relevant competent authority or authorities.
1. Panoramica
| Titolo |
Regolamentazione |
,
1.1 Riferimenti
1.2 Requisiti identificati
1.3 Standard correlati
2. Requisiti identificati
Requisiti
| Fonte |
Requisito |
3. Standard correlati
|