+Article 5 5

Article 5 5

5.   Before submitting the proposed methodology to ACER, the ENTSO for Electricity shall conduct a consultation involving at least the regional coordination centres, industry and consumer organisations, producers or their trade bodies, transmission system operators and relevant distribution system operators, competent authorities, regulatory authorities and other relevant national authorities. The ENTSO for Electricity shall duly take into account the results of the consultation and present them, together with the proposed methodology, at a meeting of the ECG.

1. Panoramica

,
Titolo Regolamentazione

1.1 Riferimenti

1.2 Requisiti identificati

1.3 Standard correlati

2. Requisiti identificati

Requisiti
Fonte Requisito

3. Standard correlati

Standard
Fonte Requisito