+Article 8 1

Article 8 1

1.   By 5 January 2020, the ENTSO for Electricity shall submit to ACER a proposal for a methodology for assessing seasonal and short-term adequacy, namely monthly, week-ahead to at least day-ahead adequacy, which shall cover at least the following:

(a)

the uncertainty of inputs such as the probability of a transmission capacity outage, the probability of an unplanned outage of power plants, severe weather conditions, variable demand, in particular peaks depending on weather conditions, and variability of production of energy from renewable sources;

(b)

the probability of the occurrence of an electricity crisis;

(c)

the probability of the occurrence of a simultaneous electricity crisis.