+Article 59 13.
|
Article 59 13.
The Commission may adopt, on its own initiative, where the ENTSO for Electricity or the EU DSO entity have failed to develop a network code, or ACER has failed to develop a draft network code as referred to in paragraph 12, or upon the proposal of ACER under paragraph 11, one or more network codes in the areas listed in paragraphs 1 and 2.
1. Panoramica
| Titolo |
Regolamentazione |
,
1.1 Riferimenti
1.2 Requisiti identificati
1.3 Standard correlati
2. Requisiti identificati
Requisiti
| Fonte |
Requisito |
3. Standard correlati
|