+Article 5 4

Article 5 4

4.   The water reuse risk management plan shall in particular:

(a)

set out any necessary requirements for the reclamation facility operator, in addition to those specified in Annex I, in accordance with point (B) of Annex II to further mitigate any risks before the point of compliance;

(b)

identify hazards, risks and appropriate preventive and/or possible corrective measures in accordance with point (C) of Annex II;

(c)

identify additional barriers in the water reuse system and set out any additional requirements, which are necessary after the point of compliance to ensure that the water reuse system is safe, including conditions related to distribution, storage and use where relevant, and identify the parties responsible for meeting those requirements.

1. Panoramica

,
Titolo Regolamentazione

1.1 Riferimenti

1.2 Requisiti identificati

1.3 Standard correlati

2. Requisiti identificati

Requisiti
Fonte Requisito

3. Standard correlati

Standard
Fonte Requisito