+Article 10 3.
|
Article 10 3.
By 12 February 2026, all buildings, including elements thereof under joint ownership, undergoing major renovations as defined in Article 2, point (10), of Directive 2010/31/EU, shall be equipped with a fibre-ready in-building physical infrastructure, and in-building fibre wiring, including connections up to the physical point where the end user connects to the public network, if that does not disproportionately increase the costs of the renovation works and if it is technically feasible. All multi-dwelling buildings undergoing such major renovations shall also be equipped with an access point.
1. Panoramica
| Titolo |
Regolamentazione |
,
1.1 Riferimenti
1.2 Requisiti identificati
1.3 Standard correlati
2. Requisiti identificati
Requisiti
| Fonte |
Requisito |
3. Standard correlati
|