+Article 20 6a.

Article 20 6a.

By way of derogation from paragraphs 2 and 4 of this Article, the time limits set out in paragraph 2, first subparagraph, and in paragraph 4 shall be reduced to seven working days for an EU Follow-on prospectus that is subject to the maximum length referred to in Article 14a(5) and (6). The issuer shall inform the competent authority at least five working days before the date envisaged for the submission of an application for approval.

The reduced time limit set out in the first subparagraph of this paragraph shall not apply to an EU Follow-on prospectus drawn up by issuers as referred to in Article 14a(1), point (c).

1. Apžvalga

,
Pavadinimas Reguliavimas

1.1 Nuorodos

1.2 Nustatyti reikalavimai

1.3 Susiję standartai

2. Nustatyti reikalavimai

Reikalavimai
Šaltinis Reikalavimas

3. Susiję standartai

Standartai
Šaltinis Reikalavimas