+Article 10 Principles of capacity-allocation mechanisms and congestion-management procedures concerning transmission system operators
---+Article 10 1
---+Article 10 2
---+Article 10 3
---+Article 10 4

Article 10 Principles of capacity-allocation mechanisms and congestion-management procedures concerning transmission system operators

1. Apžvalga

,
Pavadinimas Reguliavimas
Article 10 1

1.   The maximum capacity at all relevant points referred to in Article 33(3) shall be made available to market participants, taking into account system integrity and efficient network operation.

Article 10 2

2.   The transmission system operator shall implement and publish non-discriminatory and transparent capacity-allocation mechanisms, which shall:

(a)

provide appropriate economic signals for the efficient and maximum use of technical capacity, facilitate investments in new infrastructure and in alternative demand-side solutions not requiring new infrastructure investments and facilitate cross-border exchanges in natural gas;

(b)

be compatible with the market mechanisms including spot markets and trading hubs, while being flexible and capable of adapting to evolving market circumstances; and

(c)

be compatible with the network access systems of the Member States.

Article 10 3

3.   The transmission system operator shall implement and publish non-discriminatory and transparent congestion-management procedures which facilitate cross-border exchanges in natural gas on a non-discriminatory basis and which shall be based on the following principles:

(a)

in the event of contractual congestion, the transmission system operator shall offer unused capacity on the primary market at least on a day-ahead and interruptible basis; and

(b)

network users may re-sell or sublet their unused contracted capacity on the secondary market.

As regards the first subparagraph, point (a), a Member State may require notification or information of the transmission system operator by network users.

Article 10 4

4.   Transmission system operators shall regularly assess market demand for new investments taking into account the joint scenario as developed for the ten-year network development plan pursuant to Article 55 of Directive (EU) 2024/1788 as well as security of supply.

1.1 Nuorodos